Sleeping Bag Single 213cm Thermal Camping Hiking Pink
Sleeping Bag Single 213cm Thermal Camping Hiking Pink
Sleeping Bag Single 213cm Thermal Camping Hiking Pink
Sleeping Bag Single 213cm Thermal Camping Hiking Pink
Sleeping Bag Single 213cm Thermal Camping Hiking Pink
Sleeping Bag Single 213cm Thermal Camping Hiking Pink
Sleeping Bag Single 213cm Thermal Camping Hiking Pink
Sleeping Bag Single 213cm Thermal Camping Hiking Pink
Sleeping Bag Single 213cm Thermal Camping Hiking Pink
Sleeping Bag Single 213cm Thermal Camping Hiking Pink

Sleeping Bag Single 213cm Thermal Camping Hiking Pink

Regular price $82.99 Sale price $54.95 Save $28.04
/

Fast processing — dispatched within 2 business days

Tracked delivery — follow your order from dispatch to your door

Shop with confidence — 12-month warranty included

✨ Spend $200 & Start Saving ✨ Spend $200, Save $15 | Spend $300, Save $25 | Spend $500, Get 10% Off! (See all tiers)

Discount applied automatically at checkout.


Only 30 items in stock!

shipping estimate

Experience year-round comfort with our premium 3-4 season sleeping bag, perfect for the Australian outdoors. With temperatures between -5 and 20 degrees, it ensures a cozy night's sleep from spring through to winter. Measuring a generous 213cm x 75cm, it offers plenty of room for adults to stretch out. The durable 190T polyester shell and soft-touch lining provide the perfect balance of warmth and breathability. Filled with 500gsm hollow fibre filling and lined with soft polyester pongee fabric, the sleeping bag is soft, lightweight and water-resistant. For added comfort, the two-way zipper at the bottom allows for easy foot ventilation, while the adjustable drawstring hood keeps you snug on chilly nights. Lightweight and highly portable, it packs down effortlessly into its compact carry bag—ideal for hiking and road trips. Planning a family adventure? We also stock the matching kids' version in our store so the whole family can stay cozy together! Durable, practical, and family-ready, it's the ultimate companion for your next camping getaway.

Features
500g/m² hollow fibre filling
Soft polyester pongee lining
Suitable for -5 degrees to 20 degrees
Lightweight
Water-resistant
Colourful design
Adjustable tightening strap
Secure closure velcro
Double opening zippers
Comes with a carry bag

Specifications:
Color: Pink
Material: 190T polyester ripstop
Filling: 500gsm hollow fibre
Lining: 190T polyester pongee
Temperature range: -5 degrees to -20 degrees
Comfort rating: 10 degrees
External dimensions: 213m (L) x75cm (W)
Packed dimensions: 27m (D) x45cm (H)
Weight: 2kg

Package Content
Single Sleeping Bag x 1
Carry bag x 1

This product comes with 1 year warranty



Product ID: 11357

Orders are typically dispatched within 1–2 business days after payment has been confirmed.

Estimated delivery time:

VIC 3–5 business days
NSW, ACT, SA & QLD 5–8 business days
WA, NT & TAS 7–10 business days

Delivery timeframes are estimates only and may vary depending on your location and the courier's network.

Enter your postcode above to view the estimated shipping cost for this item.

Some orders may be dispatched and delivered separately if they contain products shipped from different warehouses.

This item cannot be delivered to PO Boxes or Parcel Lockers. Please provide a residential or business street address.

For more information, please refer to our Delivery & Shipping Policy.

If your item arrives faulty, damaged or not as described, we'll work with you to make it right.

Enjoy peace of mind with our 14-day change-of-mind returns. Items must be returned unused and in their original packaging.

See our Returns & Refund Policy for full details.

Find quick answers to the questions we receive most often before ordering.

Is this item in stock?

Yes. If you're able to place an order through our online store, the item is currently available. In the rare event of an unexpected stock issue, our Customer Care team will contact you promptly with the available options.

How do I check delivery availability and shipping costs?

Simply enter your postcode in the Shipping Estimate calculator on this product page to instantly check whether delivery is available to your area and view the shipping cost.

How long does it take to process my order?

Most orders are processed and dispatched within 1-2 business days. Once your order has been shipped, you'll receive a tracking email so you can follow its journey.

How long does delivery take?

Please refer to the Delivery & Shipping section above for estimated delivery timeframes and shipping information.

Will I receive a tracking number?

Yes. A tracking link will be emailed to you as soon as your order has been dispatched, so you can monitor your delivery every step of the way.

What is included in the package?

Please refer to the product description and specifications for a complete list of what's included with this product. If an item or accessory is not listed, it is not included.

Does this product require assembly?

Assembly requirements vary by product. Please refer to the product description for assembly information and what's included in the package.

Are all items brand new?

Yes. All products sold by FURNILAND are brand new and shipped in their original packaging.

Does this product come with a warranty?

Yes. Warranty details for this product can be found at the end of the product description. If you need any assistance during the warranty period, our Customer Care team is always happy to help.

Can I return my order?

Please refer to the Returns & Refunds section above for a summary of our return process. For full details, please see our Returns & Refunds Policy.

Can I pick up my order?

We currently offer delivery only. Simply enter your postcode in the Shipping Estimate calculator to check delivery availability and shipping costs.

What payment methods do you accept?

We accept a range of secure payment options, including major credit and debit cards, PayPal, Shop Pay, Google Pay, Apple Pay, and other payment methods displayed at checkout.

Can I get a GST tax invoice?

Yes. A GST tax invoice is available for every order. If you need another copy after your purchase, our Customer Care team will be happy to assist.